GROWING TOGETHER
Over the next few months we will be working on a number
of projects here at the park. Many of these projects will be on the playing field, some will be infrastructure that might
not be visible to players, but hopefully will improve the entire experience from check-in to departure.
As many of you know, none of the owners are receiving
any form of compensation from the park. We are putting all money that we make from the park back into improvements. We want
to make it the best mil-sim park we can.
To
accelerate the rate of improvements and to allow our friends to participate in the process we will post on this page various
materials and equipment that could be used to make improvements. If you happen to have access to any of these items (large
or small) they will be put to good use in improving the park. If you don't have a way to get something to the park, we
will work on arrangements for transportation.
All
of the owners have other jobs, so we can't work on park projects every day. But, we will post the days that we will be
working at the park so that if you have some free time you can come out and work with us for a few hours. It's a great
way to get to know each other better and to have input on future park plans. Please send us an e-mail if you think you might
be able to come out on one of the posted days so we'll know you're coming. (Lunch and drinks will be provided.)
Day & hours
Planned Projects
TBA
Equipment & Material list:
Used or new metal roofing
Bulldozer or Bobcat
Railroad ties
Trenching machine for drainage pipe
Framing lumber- Two-by-twos, two-by-fours, two-by-sixes, etc., etc., etc.
Plywood all types
Used stockade fence panels
Landscape timbers, pressure treated
4x4's
Gravel
Sand
Portland cement
Ready-mix concrete
Mortar mix
Bricks and blocks
Reinforcing rods (rebar) all sizes
Wire mesh for concrete
Wire lathe for plaster
Angle iron, I-beams, and C-channel
Paint
Concrete culverts
PVC drainage pipe
Steel cable-3/8 to 1/2
Poly rope 3/8 to 1/2"
Outdoor tables